Arapahoe Substation

Home > Arapahoe Substation

Overview

We are constructing and operating an expansion at the existing Arapahoe Substation on South Platte River Drive in Denver, Colorado. Expansion at the Arapahoe Substation includes installing a new 115/230 kilovolt transformer and relocating, removing, replacing, and adding various substation equipment and poles.

This project is part of the larger Denver Metro Transmission Upgrades to upgrade the existing electric system to support new power generation sources and meet future electricity needs.

This map is a graphic and may not show exact locations

Schedule

Work is expected to begin in May 2028 with all project components in service by September 2029.

Schedules are subject to change.